Specifications
TM 9-2330-384-14&P
4-60. NOSE ADAPTER REPLACEMENT.
a.
Removal
b.
Installation
Equipment Conditions:
Ref Conditions
4-38 SERVICE and EMERGENCY air cou-
plings removed from nose adapter.
4-14 Voltage control unit removed.
Tools:
Materials/Parts:
Eight locknuts
Eight starwashers
Personal Required: Two
Tool kit, general mechanic’s
a.
REMOVAL
(1)
Remove four locknuts (9), wash-
ers (8), and screws (5). Remove
two storage brackets (6) for
dummy couplings (7) from nose
adapter (1). Let dummy cou-
plings hang from fuel warning
placard (2). Discard locknuts.
(2)
Remove four locknuts (10), eight
starwashers (3), and four screws
(4). Remove fuel warning placard
(2) and dummy couplings (7).
Remove nose adapter (1) from
mounting
brackets.
Discard
locknuts and starwashers.
b. INSTALLATION
(1) Thread cable loops of dummy
couplings (7) through fuel warn-
ing placard (2) extensions. Install
nose adapter (1) and fuel warning
placard to mounting brackets with
four screws (4), eight new star-
washers (3)
and four new
locknuts (10).
(2)
Install two storage brackets (6) for dummy couplings (7) to nose adapter (1) with four screws
(5), washers (8). and new locknuts (9). Hang dummy couplings on storage brackets.
FOLLOW-ON TASKS:
Install voltage control unit (see paragraph 4-14).
Install SERVICE and EMERGENCY air couplings to nose adapter (see paragraph 4-38).
4-185










