Specifications
TM 9-2330-384-14&P
4-56. SPRING REPLACEMENT (Con't).
(6)
Tap on spring (8) to aline it in frame hanger (2) and equalizer (6). Torque locknuts (1 and 5)
to 50 lb.-ft. (68 N•m).
(7)
Install delrin liner (14), saddle (9), two U-bolts (4), four washers (11), and nuts (12).
(8)
Torque four nuts (12) in a diagonal sequence to 150 lb.-ft. (203 N•m). Torque same four
nuts in same diagonal sequence to 360 lb.-ft. (488 N•m).
NOTE
Paint, rust, or other contaminants can give a false torque reading. Step 9
must be performed to ensure a proper torque.
(9)
Back off four nuts (12) two turns, then torque to 360 lb.-ft. (488 N•m).
(10) Lower frame.
(11) Install tires (see paragraph 4-45).
(12) Remove jackstand and lower axle (13).
FOLLOW-ON TASKS:
Remove and stow chock blocks (see paragraph 2-11).
4-178