Specifications
TM 9-2330-384-14&P
4-52. LANDING GEAR REPLACEMENT (Con't).
NOTE
Ensure lending gear log (11) Is square In relation to frame (3).
(10) Torque six locknuts
(16)
to
180 lb.-ft.
(244 N-m). Torque
locknuts (1, 16, 25, and 29) to
250 lb.-ft. (339 N-m).
(11) Trim excess mylar tape.
3
1
r
16
(12)
Position sand shoe (32) at landing
gear log (11) with vertlcal edge of
sand shoe facing front of semi-
trailer. Slide In axis tube (31). In-
stall two now retaining rings (33) at
31
axie tube ends.
32
(13) Refer to Chapter 3. Section I to lu-
bricate landing gear.
3
L:;;' FRONT
FOLLOW-ON TASKS:
Remove and stow chock blocks (see paragraph 2-11).
1@@33
4-167










