Specifications

TM9-2330-384-14&P
Table. Unit PreventiveMaintenanceChecksandServices(PMCS)Con't).
M-Monthly S-Semlannually
A-Annually
ITEM INTERVAL
ITEMTOBE
PROCEDURES
NO. M S A
INSPECTED
NOTE
If semitraileris new,wheelnuttorqueshouldbe
checkedatfirst100,500,and1,000miles.Thereafter,
checkshouldbemadeMONTHLY.
c. Checktorqueofwheelnutsateachwheel.Wheelnutsshould
be torqued to 250 lb.-ft. (339 N-m).
d. Inspect hose and gage stick tube assembly for looseness of
mounting hardware or damage. Tighten mounting hardware if
loose.
e. Inspect grounding stud at spare tire carrier for damage. It must
be unpainted, securely mounted and clean. If grounding stud is
damaged, replace (see paragraph 4-64).
Change1
4-11