Drawing No. :- TPC325 Issue :- 8 Date :- 10/12/13 EBAC MODEL PD120 INDUSTRIAL DEHUMIDIFIER OWNER’S MANUAL Ebac Industrial Products, Inc. 700 Thimble Shoals Blvd, Suite 109 Newport News, VA. 23606-2575 Tel: (757) 873 6800 Fax: (757) 873 3632 Website www.ebacusa.
Drawing No.
Drawing No. :- TPC325 Issue :- 8 Date :- 10/12/13 UNPACKING Carefully remove the PD120 dehumidifier unit from its transit box and visually check for signs of transit damage. If there is evidence of damage DO NOT attempt to operate the unit, call your supplier for advice. Do not discard the packing, it will be useful when transporting the dehumidifier unit in the future. INTRODUCTION The Ebac PD120 industrial dehumidifier removes moisture from the air through the refrigeration process.
Drawing No. :- TPC325 Issue :- 8 Date :- 10/12/13 SPECIFICATIONS MODEL: Ebac PD120 HEIGHT: 17.
Drawing No. :- TPC325 Issue :- 8 Date :- 10/12/13 INSTALLATION POSITIONING: Position the dehumidifier unit in the center of the room to be conditioned if at all possible. However if a damp patch is particularly apparent the outlet grille should be pointed towards it if possible. This unit can also be used in a duct system where applicable, please see the diagrams on the following pages which identify the overall sizes of the unit and also the mounting points.
Drawing No. :- TPC325 Issue :- 8 Date :- 10/12/13 OPERATION The following procedures should be followed to test the PD120 for correct operation: 1) After unpacking, examine all external features to confirm damage-free shipment. Report all defects and damage at once. Connect the power cable to a grounded power source. 2) Install drain tubing as required. Caution: Do not operate the machine without the covers for any longer than necessary. Do not remove/ replace the covers when the unit is in operation.
Drawing No. :- TPC325 Issue :- 8 Date :- 10/12/13 WARNING: ENSURE THAT THE POWER CORD TO THE MACHINE HAS BEEN DISCONNECTED BEFORE CARRYING OUT ROUTINE MAINTENANCE ON ITEMS 1, 2, 4, 5, AND 6. To ensure continued full efficiency of the dehumidifier, maintenance procedures should be performed as follows: 1. Clean the surface of the evaporator and condenser coils by blowing the dirt out from behind the fins with compressed air.
Drawing No. :- TPC325 Issue :- 8 Date :- 10/12/13 REPAIRS 1. Should an electrical component fail, consult the Factory Service Center to obtain the proper replacement part. 2. If refrigerant gas is lost from the machine, it will be necessary to use a refrigeration technician to correct the fault. Contact the Factory Service Center prior to initiating this action. Any competent refrigeration technician will be able to service the equipment. The following procedure must be used: a.
Drawing No. :- TPC325 Issue :- 8 Date :- 10/12/13 TROUBLESHOOTING REMEDY SYMPTOM CAUSE Unit inoperative 1. no power to unit Little or no airflow 1. 2. 3. 4. Little or no water extraction 1. Insufficient air flow 2. Compressor fault 3. Loss of refrigerant gas Unit vibrates excessively 1. Loose compressor mounts 2. Damaged fan Water flooding inside the machine 1. Drain pipe blocked/frozen 2.
Drawing No. :- TPC325 Issue :- 8 Date :- 10/12/13 RATING PLATE INFORMATION PD120 MOISTURE REMOVAL (PINTS PER 24 HOURS) @ 80F / 60% RH: RH: REFRIGERANT: VOLTAGE: POWER: PHASE: HZ: CURRENT: CONTROL VOLTAGE: TIME DELAY FUSE: 107 1300 Grams 115 Volts 1.
Drawing No. :- TPC325 Issue :- 8 Date :- 10/12/13 LIMITED WARRANTY Our products carry a one-year unconditional warranty against any defects in workmanship or material. This warranty will cover all parts and labor required to repair your Ebac product. This warranty is invalid if the unit has been abused, damaged, whether intentional or accidental, or if any modifications have been made to the unit.
Drawing No.
Drawing No.
A B C D 6 6 WALL PD120 / PD200 5 TOP VIEW THERMOSTAT AND POWERCORD AIRFLOW INLET DUCT INLET END FILTER INSERTED 5 305mm ALLOW FOR SERVICE CLEANER AIRFLOW 4 4 DISCHARGE DUCT DISCHARGE END DATE 23/10/08 3 PD120 / PD200 2 COMMENTS ORIGINAL DO NOT SCALE IF IN DOUBT ASK TITLE 2 MATERIAL DIMENSIONS IN m.m. TOLERANCES UNLESS OTHERWISE STATED 0. 1 FINISH 0.25 0.0 0.05 0.00 ANGULAR 0.
308 658 Once the unit is in the desired location a 1/2" flexible pipe must be connected to the condensate drainage outlet which is positioned under the air inlet aperture as shown above. This should then be used to drain away condensate water into a permanent drain or a water collection container. The above diagrams show the overall sizes of the unit, the positionng of the air inlet aperture, the positioning of the air discharge aperture and the M8 mounting points on the base of the unit.
Drawing No. :- TPC325 Issue :- 8 Date :- 10/12/13 UK Head Office American Sales Office German Sales Office Ebac Industrial Products Ltd St Helens Trading Estate Bishop Auckland County Durham DL14 9AD Ebac Industrial Products Inc 700 Thimble Shoals Blvd. Suite 109, Newport News Virginia, 23606-2575 USA Ebac Industrial Products Ltd. Gartenfelder Str.