Use and Care Manual

Page 5 of 16
Drawing : - TPC308
Issue : - 7
Date : - 10/12/13
BASIC STEPS FOR DRYING
Ensure that all External doors and windows are closed. Where no doors or
windows are fitted, temporarily screen off the openings.
POSITIONING
For small areas position centrally in the area to be dried, for larger areas such
as open floor plan buildings, offices or factories, a number of dryers may be
required, in such cases they should be spaced evenly around the area.
Ensure that no unit is positioned in such a way that it blows directly into
another.
For multi-level houses or apartments, position the dryer on one floor at a time,
starting at the lowest floor, closing all internal doors on the floor previously
dried. Continue until all floor levels have been dried.
Note when a particular damp patch is to be dried out, the air outlet grille
should be directed towards that area but should never be closer than 1meter
or 3 feet to that area. At no time should the inlet or outlet grilles be covered or
obstructed.
DRAINAGE
Under most operating conditions water will be produced continuously and it is
important that it is drained away correctly and not allowed to spill. Any spillage
will evaporate and will therefore, have to be recycled through the dryer again,
which in effect, only prolongs the drying period.
PORTABLE CONTAINERS
Position a closed top container within close proximity (approximately 25 litres
or 53 pints capacity). Use a transparent container; this will enable you to
check the level of water in order to prevent overflowing. As the unit will be
running for long periods of time, a regular check should be made on the
container water level.
PERMANENT DRAINAGE
This unit is equipped with a built in condensate pump which is capable of a 20
foot vertical lift. This unit also comes with a 25 foot section of detachable drain
hose.