Specifications

68
EATON CORPORATION Reference Guide & Pricebook
January 1, 2012
EATON 9155 UPS
Powerware series (continued)
OUTPUT RECEPTACLES AND MAINTENANCE BYPASS
Order Number Description Dimensions (H x W x D, inches) Weight (lb) List Price
See worksheet below: Power Distribution Module (PDM) with Mechanical 16.5 x 12.0 x 7.0 25.0 $999
Bypass Switch (rear UPS mount)*
Receptacle Codes (Qty) NEMA Type
(Select digits 9–12 in the CTO number)
Price Adder
PDM Worksheet CTO Description Voltage Phase per Receptacle Code Chosen
S Mechanical Bypass Module only $999
A (4) 5-15R 120V Single $220
B (4) 5-20R UL 120V Single $220
D (4) 6-15R 208V Dual $220
E (4) 6-20R 208V Dual $220
F (4) L5-15R 120V Single $220
G (2) L5-20R* 120V Single $220
H (2) L5-30R* 120V Single $220
I (2) L6-15R 208V Dual $220
J (2) L6-20R* 208V Dual $220
K (2) L6-30R* 208V Dual $220
L (2) L14-20R* 120/208V Dual $220
M (2) L14-30R* 120/208V Dual $220
X Blank Plate - - $20
0 (Zero) Last Product Identifier Number - - -
Notes: If any output receptacles are chosen, the Maintenance Bypass module will be included and will add $999 to the cost. Maximum 4 choices within CTO part number (9-12). The combined quantities
of LOCKING receptacles (denoted with a *) must not exceed four. Please be sure to utilize the "X" designation for any of the 4 total slots not populated. * Please contact factory for custom configuration
availability.
* If only mechanical bypass is chosen, remaining three slots should be populated with "0".
9155 OPTIONS
Model Number Description Dimensions (H x W x D, inches) Weight (lb) List Price
Hot Sync (Parallel Systems)*
124100017-001 9155 Parallel Tie Cabinet 24.00 x 20.30 x 6.00 80.0 $1,559
103004336 CAN Bridge Card - - $519
Note: Up to (3) PW9155s can be paralleled within the Parallel Tie Cabinet and each UPS must include a Hot Sync CAN Bridge Card installed in the 2nd X-Slot.
Extended Battery Module
103004192-5501 PW9155 EBM 64 (2-high Stack) 32.20 x 12.00 x 30.20 480.0 $5,640
103004193-5501 PW9155 EBM 96 (3-high Stack) 47.80 x 12.00 x 30.20 710.0 $8,047
Note: Up to (4) EBM64s or (3) EBM96s can be added for additional runtime.
Maintenance Bypass Module (MBM)
BPE20MBB1A Wall-mounted Maintenance Bypass Module 21.00 x 14.00 x 6.75 34.0 $1,790
9155 Upgrade Packages
103004195 PW9155 One-step kVA Upgrade Kit $1,249
103004196 PW9155 Two-step kVA Upgrade Kit $2,499
Seismic Kit
103004194-5501 Seismic kit, Rated Zone 4, UL tested, performance rating 136.0 $1,871
based on NEBS GR-63-CORE Standard Vibration Test
Notes: An 8 to 15 kVA upgrade would require purchase of a one and two-step upgrade. Up to three 9155s can be paralleled within the Parallel Tie Cabinet and each UPS must include CAN Bridge Card
installed in the second X-Slot. For extended runtime applications, each UPS must have dedicated and identical number of EBMs. Kit includes CAN Bridge Card and Instructions.
* Eaton startup is required for factory warranty of parallel configuration.
SOFTWARE AND CONNECTIVITY OPTIONS
Bundled with Intelligent Power Software Suite CD and communication cable. See the software and connectivity sections for more details.
9155 SERVICE PLANS
Gold Plans Contract Onsite Gold Plan List Onsite Gold Plan List
Product Duration Part Number Price Plus Part Number Price
8–10 kVA 2 YR 2OSGX915510KVCX $840 2OSGP915510KVCX $1,837
3 YR 3OSGX915510KVCX $1,587 3OSGP915510KVCX $3,618
5 YR 5OSGX915510KVCX $3,118 5OSGP915510KVCX $6,154
12–15 kVA 2 YR 2OSGX915515KVCX $924 2OSGP915515KVCX $1,929
3 YR 3OSGX915515KVCX $1,746 3OSGP915515KVCX $3,957
5 YR 5OSGX915515KVCX $3,586 5OSGP915515KVCX $6,714