7. Reinstall the front covers, starting with the bottom cabinet (see
Figure 38).
Hang the top edge of the cover on the cabinet first, then lower the
bottom edge and snap into place. Verify that the cables fit in the
access holes in the covers.
Figure 38. Reinstalling the Front Covers
8. Continue to “Stabilizing the Cabinet” on page 47 to complete the
parallel UPS installation.
NOTE After UPS startup, ensure maximum battery runtime by configuring the UPS for the
correct number of EBMs (see page 61).