User`s guide
VERSION 2 TIE CABINET PARALLEL INSTALLATION
Eaton 9355 Parallel UPS (10/15 kVA) User's Guide S 164201601 Rev B www.eaton.com/powerquality
28
4. Determine your equipment's grounding requirements according to
your local electrical code.
5. Unfasten the bypass cabinet front door latch and swing the door
open (see Figure 21).
6. Follow the instructions on the inside of the door to open or remove
the front cover (see Figure 21 and Figure 22).
Door Latch
Door
Front Cover
Figure 21. Version 2 Parallel Tie Cabinet Front Door and Cover