User`s guide
VERSION 1 TIE CABINET PARALLEL INSTALLATION
Eaton 9355 Parallel UPS (10/15 kVA) User's Guide S 164201601 Rev B www.eaton.com/powerquality
24
19. Wire the AC input to the bypass breaker (see Figure 18).
Line 1
Line 2
Line 3
Figure 18. Version 1 Bypass AC Input Wiring
20. Verify the phase rotation for each UPS and the bypass input.
21. Reinstall the internal cover removed in Step 6.
22. Reinstall the parallel tie cabinet front cover removed in Step 5.
23. Continue to “Installing Options” on page 41.