Unloading the Cabinet(s)
The following tools are required for unloading the cabinet(s):
S 15 mm wrench or socket
S 7 mm nut driver or socket
C A U T I O N
The UPS and Extended Battery Module (EBM) are heavy (see page 8). Unloading the
cabinets requires at least two people to safely remove the cabinets from the pallet.
To unload three-high cabinets or two-high EBMs, continue to the
following section. To unload two-high UPS cabinets, proceed to page 13.
Three-High Cabinets or Two-High EBMs
To remove a three-high cabinet or a two-high EBM from the shipping
pallet:
1. Remove the two M10 bolts securing the stabilizing bracket to the
pallet (see Figure 2).
M10 Bolts