Metering Devices, Protective Relays, Software and Connectivity
Monitoring Software and Reporting
Power Xpert Reporting—the perfect complement
Power Xpert Reporting helps bring information from the
software together. Power Xpert Software brings together your
power system information from around the floor to around the
world—data and information that is invaluable. Power Xpert
Reporting brings all the power system information together to
compare, contrast and generally give you the big picture. Power
Xpert Reporting provides a standard set of reports, including:
Data Center Efficiency Report: A summary of data center
infrastructure efficiency and power usage effectiveness,
including such information as temperature and humidity, and
energy consumption
Greenhouse Gas Report: Captures the six offensive
greenhouse gasses: Carbon Dioxide, Sulfur Dioxide, Nitrogen
Oxide, Mercury, Methane and Nitrous Oxide broken down by
selected locations within a facility
Utilities Report: Captures consumption of water, air, gas,
electricity and steam (WAGES)
Capacity Summary Report: The summary of top- and
bottom-loaded circuits, as well as loading details for each
circuit according to user-defined date/time range and facility
hierarchy location
Branch Circuit Monitoring Report: Determine branch circuit
loading levels at a glance with color-coded graphics indicating
loading status against capacity. Redundant sources can be
reviewed, as well as single source loads
Energy Summary Report: The summary of consumption
(kWh) and demand (kW) for a user-defined date/time range
and facility hierarchy location
Energy Cost Allocation Report: The total energy bill dollar
value or a cost per kWh across a facility hierarchy for a user-
defined date/time range
Power Quality Report: The distribution and trend for amps,
volts and THD according to user-defined date/time ranges and
facility hierarchy location
Event Summary Report: Provides a Pareto chart of events
according to user-defined date/time ranges and facility
hierarchy location
Joint Commission Report: Standard Joint Commission
compliant report supports hospital power test requirements.
It checks events, key metrics of generators and automatic
transfer switches (ATS) during generator testing at user-
defined date/time ranges and facility hierarchy location