User`s guide

Virtualization
78 Eaton Intelligent Power Manager (IPM) User’s Guide v1.40
P-164000289—Rev 2
Figure 84. System Settings Page
When a user tries to add a connector by Se
ttings->Infrastructure Connectors->Add a connector, the
sequence if screens show options available, depending of the JRE prerequisite (see Figure 85). The
unselectable options are italic and grayed-out.
l
If any JRE is not installed on the system hosting Eaton IPM, only legacy virtualization connectors can be
selected (legacy for VMware), but new connectors cannot be selected (New VMware vCenter, New
VMware ESX/ESXi, NetApp Storage, or Cisco UCS Manager).
l
If a JRE is installed on the system hosting Eaton IPM, new infrastructure connectors are available (see “JRE
Prerequisites” on page 10).
Figure 85. Selectable and Non-selectable Connectors