Installation Manual

Chapter 6—Installation Requirements
24 DG1 Series VFD MN040002EN—March 2014 www.eaton.com
Figure 16. Mounting Space
Table 17. Space Requirements for Mounting the DG1 Series VFD and Airflow
Notes
1
Minimum clearances A and B for drives with Type 12 (IP54) enclosure is 0 mm (in).
2
kW ratings are at 400V / 50 Hz.
The above guidelines apply unless testing has been completed to validate a design outside of these recommendations.
3
FR6 and 575 Vac available in 2015.
Frame
Size Voltage hp (CT/I
H
)kW
2
Amperes
A
1
In (mm)
B
1
In (mm)
C
In (mm)
D
In (mm)
Cooling Air
Required
CFM (m
3
/h)
FR1 230 Vac 0.75–3 0.55–2.2 3.7–11 0.79
(20)
0.79
(20)
3.94
(100)
1.97
(50)
22
(38)
480 Vac 1–5 0.75–3.7 2.2–7.6
575 Vac
3
2–5 1.5–3.7 3.3–7.5
FR2 230 Vac 4–7.5 3–5.5 12.5–25 1.18
(30)
1.18
(30)
6.30
(160)
2.36
(60)
55
(94)
480 Vac 7.5–15 5.5–11 12–23
575 Vac
3
7.5–15 5.5–11 10–18
FR3 230 Vac 10–15 7.5–11 31–48 1.97
(50)
1.97
(50)
7.87
(200)
3.15
(80)
126
(214)
480 Vac 20–30 15–22 31–46
575 Vac
3
20–30 15–22 22–34
FR4 230 Vac 20–30 15–22 61–88 3.15
(80)
3.15
(80)
11.81
(300)
3.94
(100)
153
(260)
480 Vac 40–60 30–45 61–87
575 Vac
3
40–60 30–45 41–62
FR5 230 Vac 40–60 30–45 114–170 3.15
(80)
3.15
(80)
11.81
(300)
7.87
(200)
366
(622)
480 Vac 75–125 55–90 105–170
575 Vac
3
75–125 55–90 80–125
FR6
3
230 Vac 75–100 55–75 211–261
33333
480 Vac 150–200 110–150 205–261
575 Vac
3
150–200 110–160 144–208
A
C
D
B B
A