Installation Manual

I.L. 70-8381
Effective 10/99
Instructions for Installing a Circuit Breaker Kit on 1-Phase
and 3-Phase Commercial Type Meter Modules
KIT CONTAINS: TOOLS REQUIRED:
- FLAT BLADE SCREWDRIVER
- RATCHET
- EXTENSION
- 5/16 SOCKET
- DRILL
- 9/32 DIA. DRILL BIT
Please read these instructions completely before installing
or removing device. Improper installation could be
hazardous to personnel and/or equipment.
Por favor lea estas instrucciones en su totalidad antes de
instalar o mover el aparato. Una instalacion inapropiada
puede ser peligrosa para el personal y/o el equipo.
Veuillez lire les présentes directives au complet avant
dinstaller ou de retirer le dispositif. Une mauvaise
installation pourait causer des blessures au personnel et/ou
endommager lequipement.
QTY DESCRIPTION
1
1
3
2
MOUNTING BRACKET
INSULATOR
1/4-20 PAN HEAD MACHINE SCREW
#8-32 MOUNTING SCREW
HAZARDOUS VOLTAGE. WILL CAUSE
SEVERE INJURY OR DEATH.
TENSION DANGEREUSE. PEUT CAUSER
DES BLESSURES GRAVES OU LA MORT.
VOLTAJE PELIGROSO. CAUSA HERIDAS
SEVERAS O MUERTE.
Turn OFF power supplying this equipment before working
inside.
INTERRUMPA el suministro de energia que alimenta este
equipo antes de trabajar en el interior del mismo.
PELIGRO
DANGER
Couper lalimentation electrique de cet equipement avant
dy effectuer des travaux.
1. Remove and discard the lugs from line (ON) end of
breaker. Enlarge the lug mounting tang hole(s) using a
9/32 dia. drill, reomove burrs.
2. Install mounting bracket supplied with kit. First remove
the existing bracket by removing (2) #8-32 screws. Save
screws for mounting new bracket. Refer to Fig. 1 at right.
3. Assemble insulator on mounting bracket as shown in
Fig. 1 at right. (the insulator has pressure sensitive
adhesive, remove paper backing.)
4. Position breaker over hex connectors as shown in Fig.
1 at right. Assemble but do not tighten (3) for 3-pole
breaker or (2) for 2-pole breaker, 1/4-20 screws (a holding
type screwdriver should be used to start screws).
5. Install (2) for 3-pole breaker or (1) for 2-pole breaker,
#8-32 mounting screws, supplied with breaker, through
breaker into support bracket below. Tighten screws.
6. Tighten the 1/4-20 screws installed in step #4 above.
Torque screws to 60-70 in.-lb. (6.8-7.9 Nm).
1/4-20 SCREWS
ON
END
8/32 BRACKET
SCREWS
ENLARGE
TANG HOLE(S)
WITH 9/32 DIA.
DRILL
HEX POSTS
8/32 MOUNTING
SCREWS
INSULATOR
REMOVE EXISTING
BRACKET AND
INSTALL BRACKET
FROM KIT
Fig. 1 Breaker Installation

Summary of content (1 pages)