Installation Manual
I.L. 70-8381
Effective 10/99
Instructions for Installing a Circuit Breaker Kit on 1-Phase
and 3-Phase Commercial Type Meter Modules
KIT CONTAINS: TOOLS REQUIRED:
- FLAT BLADE SCREWDRIVER
- RATCHET
- EXTENSION
- 5/16 SOCKET
- DRILL
- 9/32 DIA. DRILL BIT
Please read these instructions completely before installing
or removing device. Improper installation could be
hazardous to personnel and/or equipment.
Por favor lea estas instrucciones en su totalidad antes de
instalar o mover el aparato. Una instalacion inapropiada
puede ser peligrosa para el personal y/o el equipo.
Veuillez lire les présentes directives au complet avant
dinstaller ou de retirer le dispositif. Une mauvaise
installation pourait causer des blessures au personnel et/ou
endommager lequipement.
QTY DESCRIPTION
1
1
3
2
MOUNTING BRACKET
INSULATOR
1/4-20 PAN HEAD MACHINE SCREW
#8-32 MOUNTING SCREW
HAZARDOUS VOLTAGE. WILL CAUSE
SEVERE INJURY OR DEATH.
TENSION DANGEREUSE. PEUT CAUSER
DES BLESSURES GRAVES OU LA MORT.
VOLTAJE PELIGROSO. CAUSA HERIDAS
SEVERAS O MUERTE.
Turn OFF power supplying this equipment before working
inside.
INTERRUMPA el suministro de energia que alimenta este
equipo antes de trabajar en el interior del mismo.
PELIGRO
DANGER
Couper lalimentation electrique de cet equipement avant
dy effectuer des travaux.
1. Remove and discard the lugs from line (ON) end of
breaker. Enlarge the lug mounting tang hole(s) using a
9/32 dia. drill, reomove burrs.
2. Install mounting bracket supplied with kit. First remove
the existing bracket by removing (2) #8-32 screws. Save
screws for mounting new bracket. Refer to Fig. 1 at right.
3. Assemble insulator on mounting bracket as shown in
Fig. 1 at right. (the insulator has pressure sensitive
adhesive, remove paper backing.)
4. Position breaker over hex connectors as shown in Fig.
1 at right. Assemble but do not tighten (3) for 3-pole
breaker or (2) for 2-pole breaker, 1/4-20 screws (a holding
type screwdriver should be used to start screws).
5. Install (2) for 3-pole breaker or (1) for 2-pole breaker,
#8-32 mounting screws, supplied with breaker, through
breaker into support bracket below. Tighten screws.
6. Tighten the 1/4-20 screws installed in step #4 above.
Torque screws to 60-70 in.-lb. (6.8-7.9 Nm).
1/4-20 SCREWS
ON
END
8/32 BRACKET
SCREWS
ENLARGE
TANG HOLE(S)
WITH 9/32 DIA.
DRILL
HEX POSTS
8/32 MOUNTING
SCREWS
INSULATOR
REMOVE EXISTING
BRACKET AND
INSTALL BRACKET
FROM KIT
Fig. 1 Breaker Installation

