Specifications
Access Power Solutions Installation and Operation Guide (APS6-300/500 and APS12-300 Series)
36
Copyright © 2007-2012 Eaton Corporation. All Rights Reserved.
IPN 997-00012-49F November 2012
Start-Up Tasks
Complete all the Installation tasks (see details on page 20) before starting these Start-Up tasks.
Complete the Start-Up tasks in the following order:
Task
Description
Reference
1
Insert the Rectifiers
See details on page 36
2
Complete the Pre-Power-Up Checklist
See details on page 37
3
Apply AC Power
See details on page 37
4
Configure the dc power system
See details on page 38
5
Apply DC Power to Battery and Load
See details on page 39
Task 1 - Inserting the Rectifiers
Do NOT install the rectifiers until the room has been cleaned and is dust free.
Do NOT switch on the ac supply at this stage.
Step 1 - Unpack the rectifiers
Unpack the rectifiers and inspect them carefully for possible transport damage.
Report any damage immediately using a completed Equipment Incident Report on
page 105.
Keep the original packaging to return a rectifier for replacement or repair, if required.
Step 2 - Fit first rectifier
1 Align the rectifier with the left side of the shelf.
2 Push in the rectifier until the retaining screw contacts the shelf.
3 Check the rectifier's rear connector is correctly aligned with the shelf connector
or damage may occur.
4 Tighten the retaining screw to 1.5Nm (13.3 inch-pounds). This will locate the
rectifier in its rear connector.










