Specifications

Copyright © 2007-2012 Eaton Corporation. All Rights Reserved.
IPN 997-00012-49F November 2012
19
C h a p t e r 3
Installation
Overview
Topic Page
Installation Tasks 20
Task 1 - Check the AC Supply and Earthing 20
Task 2 - Prepare APS 23
Task 3 - Connect the AC Supply Cable(s) 26
Task 4 - Mount the APS in the Rack 28
Task 5 - Connect the DC Load and Battery Cables 29
Task 6 - Install the Batteries 30
Task 7 - Mount the Battery Temperature Sensor 31
Task 8 - Connect External Input/Output Cabling (if required) 32
Task 9 - Connect Additional Input/Output (if required - SC200 only) 33
Task 10 - Connect to the AC Supply Point 33
Installation Completed 34