Operating instructions
Installation
Eaton 9E Integrated Accessory Cabinet-Tie and Bypass Installation and Operation Manual P-164000073—Rev 1 www.eaton.com/powerquality 4-29
Figure 4-23. Neutral, Ground, and Output Power Terminal Locations – 9E 60IAC-B
Ground Terminals
AC Output to
Critical Load
Phase A
Phase B
Phase C
Phase A
Phase B
Phase C
Source 1 AC Input to Maintenance Bypass
(For Single-Feed UPS: UPS Input)
(For Dual-Feed UPS: UPS Bypass Input)
Source 1 Input Neutral Terminals
(4-Breaker Version with Dual-Feed UPS Only)
Source 1 Input Neutral and Critical Load Output Neutral Terminals
UPS Rectifier Input Neutral Terminals
(4-Breaker Version with Dual-Feed) UPS Only)
UPS Input Neutral and UPS Output Neutral Terminals
(For Single-Feed UPS: UPS Input Neutral)
(For Dual-Feed UPS: UPS Bypass Input Neutral)










