Specifications
snapshot).
E. Battery Discharge Testing (at owner’s discretion)
Manufacturer shall verify the operation of the Battery Systems
x Visual inspection of battery jars and enclosures for evidence of physical
x damage, leaking, corrosion, overheating, arcing, or burning.
x Perform a partial battery discharge test on UPS battery system under full load
x conditions. (5 Minute discharge)
x Verify operation of Battery Notices and Alarms
F. Report
Eaton Powerware Field Engineer to provide a written report verifying the operation of the UPS System.










