Overview of Primary Product

120 VOLTS
CATALOG NUMBER LENGTH WATTS
ADKS-100 20´
(
6 m
)
100
ADKS-150 30´
(
9 m
)
150
ADKS-300 60´
(
18 m
)
300
ADKS-400 80´
(
24 m
)
400
ADKS-500 100´
(
31 m
)
500
ADKS-600 120´
(
37 m
)
600
ADKS-800 160´
(
49 m
)
800
ADKS-1000 200´
(
61 m
)
1000
ADKS-1200 240´
(
73 m
)
1200
MEASURE
Horizontal length of each roof section to
be protected, in feet . . . . . . . . . . . . . . . . . .
Depth of overhang for each roof section,
in inches . . . . . . . . . . . . . . . . . . . . . . . . . . .
Each dormer up, over and down
per diagram, in feet . . . . . . . . . . . . . . . . . .
Length of each downspout, in feet. . . . . .
Note number of roof intersection valleys
CALCULATION BY SECTION
A. For each section overhang depth, find
the multiplier table . . . . . . . . . . . . . . . . . .
B. If the section has no gutter, subtract
1.0 from the multiplier . . . . . . . . . . . . . . .
C. Multiply length of each roof section by
its overhang multiplier . . . . . . . . . . . . . . .
D. Total all the section dormer
measurements . . . . . . . . . . . . . . . . . . . . . .
E. For each downspout with cable running
down and back up, typically all but the
last one on a cable run, multiply length
by 2 and add together . . . . . . . . . . . . . . .
F. Total length of downspouts with cables
running down only, typically the last
one in a cable run . . . . . . . . . . . . . . . . . . .
G. Multiply the number of valleys by 6. . . .
TOTAL ITEMS C- G
40400-001 Rev. 6 © 2010 EasyHeat
PREVENT ROOF
DAMAGE AND
LEAKING
KEEP GUTTERS &
DOWNSPOUTS
FLOWING
PREASSEMBLED
READY-TO-INSTALL
EasyHeat products are provided with a
LIMITED WARRANTY:
see owner’s manual or contact EasyHeat
for complete terms and conditions.
USA Canada
2 Connecticut South Drive 99 Union Street
East Granby CT 06026 Elmira ON N3B 3L7
Tel 800/537-4732 Tel 519/669-2444
Fax 800/541-7451 Fax 519/669-6419
www.easyheat.com
ADKS SERIES
Electric Roof
De-icing Cable
Stop Damaging
Roof-Ice Buildup

Summary of content (2 pages)