Warranty Guide

IMPORTANT: During Installation, immediately wipe any adhesive from the floor surface using Bostik’s
Ultimate solvent and/or wipes.
Floating Installation
Engineered T&G hardwood floor is suitable for floating installation at any grade level, be it above grade, on grade
or even below grade onto a concrete sub-floor, wood sub-floor, ceramic tiling, or linoleum with proper site
preparation.
Recommended tools
1. Moisture Meter
2. 6 mil. Polyfilm and Foam underlayment OR 2-in-1 foam underlayment
3. Poly or Duct tape
4. Titebond Tongue & Groove wood glue
5. Flooring straps, Expansion Spacers, Chalk reel, Tape measure, Speed Square
6. Hammer, Pull bar, Tapping block
7. Electric saw or Hand saw
Preparing and leveling the sub-floor:
The sub-floor must be level, i.e., a slope of no more than 3/16" (5 mm) over 10’ (3048 mm).
The surface should be clean and free of particles.
If below grade, lay a 6-mil Polyfilm with seams overlapping 8" (200 mm).
Fasten seams every 18" to 24"(450 to 600 mm) with duct tape or poly tape.
Run 4" (100 mm) of poly-film up against the perimeter of wall.
Lay foam underlayment by butting edges and duct tape the full length of the seam.
Floating Installation Steps:
The sub-floor should be free from any surface
defect. If it is not, fill gaps with Leveling material
designed for your subfloor type.
Lay out 4 to 5 rows of planks ahead of time that
match in terms of joints and color.
Cut out imperfections in planks or place them in
less visible areas.
Lay out a layer of 6 mil Polyfilm and layer of
foam underlayment OR 2-in-1 foam
underlayment.
Run 4” of the Polyfilm up against the perimeter
walls.