Installation & Assembly

8
Important: During Installation, immediately wipe any adhesive from the floor surface using
paint thinner and towels.
Use blue adhesive tape every five or six rows
to ensure planks remain firmly in place.
Use 100-150 lb. roller to apply pressure to
installed sections while the adhesive is still
active (approximately 45-60 mins).
Once the entire surface is covered, remove the
guide planks and replace with flooring plank.
Remove the expansion spacer to install
molding to cover the expansion joint.
Completed installation with moldings.