Installation & Assembly
5
Glue Down Installation
Our Solid Hardwood flooring can be glued directly to a concrete sub-floor, wood sub-floor, or terrazzo on
the ground floor and second floor. Must not be installed over any type of vinyl; vinyl must be removed.
Cut plank to fit end row, allowing for ¼”
expansion gap and fasten with pull bar.
Start subsequent row using the remainder of
the cut-off end plank from previous row. The
remainder should be at least 6”. Fasten with
knocking block at the side.
Use manual or pneumatic nailer for
subsequent rows. Each plank should be
nailed every 6’’. Fasten each plank with at
least 2-nails. Do not nail less than 2” from
plank end to prevent the tongue from splitting.
For best results, stagger the joints 6’’ to 8’’
from the previous row and alternate lengths.
The final planks should be installed the same
way as the 1
st
plank.
You may have to rip the last row lengthwise to
leave a ½” for expansion joint.
Completed installation with moldings.










