INSTRUCTION MANUAL EAGLE PEAK PC GREENHOUSE 6 FT x 6 FT x 7 FT Thank you for choosing Eagle Peak !
CONTENTS 1. lmportant Read Before Assermbly ................................................................................................................................ 1 2. Dimensions & Specifications .......................................................................................................................................... 3 3. Part List ........................................................................................................................................................
IMPORTANT Warning! To reduce the risk of serious injury, read the following safety instructions before assembling and using the greenhouse. Please check with your local governing authority/local municipal codes regarding installation of structures before assembly. Caution! Proper placement of your greenhouse is essential. Do not place the product underneath or near electrical lines. Keep children away during assembly. This product contains small parts which can be swallowed by children.
IMPORTANT • Please read and understand this manual before any assembly. Before beginning assembly of the product, make sure all parts are present. Compare parts with packaging contents list. • Place all parts from the box in a cleared area and organize them for assembly. • Remove all packing materials and place them back into the box. Do not dispose of the packing materials until assembly is completed. • DO NOT tighten the screws before PC panel assembly in order to ensure all the parts fit with each other.
Dimensions & Specifications 58 cm 1.9 ft 207 c 6.8 m ft 19 0 6. cm 2 ft 19 6.
Part List Item NO. Size Qty Item NO. 7A 1830mm 72.0in 2X 1X 7B 1300mm 51.2in 1130mm 44.5in 1X 7C 1D 1130mm 44.5in 1X 1E 1130mm 44.5in 2A Size Qty Item NO. 1A 1215mm 47.8in 4X 1B 1130mm 44.5in 1C Size Qty 18B 595mm 23.4in 2X 4X 19B 520mm 20.5in 4X 594mm 23.4in 2X 20B 595mm 23.4in 2X 7D 1300mm 51.2in 2X 21A 603mm 23.7in 5X 1X 7K 625mm 24.6in 12X 1640mm 64.5in 1X 8A 1840mm 72.4in 2X 2B 1640mm 64.5in 1X 3A 1665mm 65.5in 1X 9A 1830mm 72.
Part List Item NO. Sketch Size mm 2 3 M6*40 4 Qty Item NO. 1X 18 2X 17X 19 4X 2X 24 6X Size Sketch Qty 5 M6*10 143X 25 4X 6 M3*20 16X 26 4X 7 M3*10 12X 27-1 1300mm 51.2in 4X 8 4X 9 2X 28 4X 10 2X 29 12X 11 1X 30 4X 13 2X 31 12X 14 178X 33 4X 15 4X 35 143X 16 8X 36 4X 17 62X 37 4X 38 4X 5 Item NO.
Part List Item NO. Size Qty Item NO. A4 603x1210mm 23.75x47.63in 11X B4 603x1120mm 23.75x44.09in 4X D4 603x590mm 23.75x23.22in 2X E4 595x550mm 23.42x21.65in 2X F4 603x655mm 23.75x25.78in 1X G4 620x240mm 24.40x9.45in 1X H4 620x230mm 24.40x9.05in 1X I4 620x600mm 24.40x26.62in 2X X4 603x440mm 23.75x17.
Step 1 Base Assembly Parts required for this step 27-1 1830 30 4X 28 4X 4X 31 8X Needed in the grass 3 4 M6*40 Needed in the grass 29 16X 4X 2X IMPORTANT: The ground, wooden deck, or concrete surface must be firm and level for maximum stability and durability. If not, the PC board may not be properly secured in the provided guide rail and may be blown out by strong wind.
Step 1 Base Assembly, cont’d 3 1.1 1.2 1.4 30 1.4 1.1 1.2 27-1 1.3 31 27-1 1.3 31 1.1 1.2 31 27-1 19 6.2 0 cm ft 19 0 6. cm 2 ft 27-1 1.1 1.2 1.1 28 1.2 29 Corner Stakes are needed to set up in soil (Status 1) 30 27-1 27-1 27-1 27-1 28 3 Assemble the foundation frame using (4) 27-1 Beams, (4) 28 Corner Brackets, (4) 29 Base Hooks, and (16) 3 Screws, Nuts and Washers. Use (4) 30 Corner Stakes, as shown in Step 1.2. if the greenhouse will be anchored directly to the ground.
Step 1 Assembly on Ground Base Assembly, cont’d 1.3 30 1.4 27-1 31 Excavate the site by removing the top 3 in of grass or soil and leveling the base, allowing a 6 in perimeter around the foundation. Assembly on Wood or Concrete Pad Build a level wood or concrete pad that is slightly wider and longer than the green house. DO NOT use Part 30 and 31 if set up on wooden deck or concrete ground. 1.
Step 2 Vent Window Assembly Parts required for this step 18B 595 2X 19B 20B 595 2X 13 595*550 2X 5 E4 7 M3*10 4X 4 10 0 520 4X 2X M6*10 8X 2X
Step 2 Vent Window Assembly, cont’d 5 2.1 19B 20B E4 2.1 2.2 2.3 13 2.4 19B 18B 2.2 2.
Step 2 Vent Window Assembly, cont’d Repeat 2X Assemble (2) Frame piece 19B to (1) Frame piece 20B using (3) Screw Set 5. Do not tighten screws at this time. 2.1 5 20B 19B 20B 2.2 19B ① 19B E4 ② 18B Slide Window E4 into the window frame. 2.3 2.4 13 19B 7 E4 5 E4 18B 18B Secure the vent window handle 13 to the window frame using (2) screw 7.
Step 3 Door Assembly Parts required for this step 11A 625 1X 12A 610 1X 15A 1600 2X 16A 625 2X 17A 625 1X 5 M6*10 2X M3*20 16X 4 6 13 2X
Step 3 Door Assembly, cont’d 5 3.1 3.1 12A 11A 15A 15A 3.2 3.2 16A 3.2 3.2 16A 3.3 3.3 17A Door pre-assembly for future step. PC Panels are not needed at this time.
Step 3 Door Assembly, cont’d Assemble Part 12A to Part 11A using (2) Screw, Washer and Nut 5. 3.1 Assemble Part 12A/11A to (2) Vertical Door Frames 11A 5 12A 6 15A Assemble Part 16A to (2) Vertical Door Frames 15A using (4) Screws 6. 3.2 Repeat with second Part 16A as shown on Page 15A 16A 6 Assemble Part 17A to (2) Vertical Door Frames 15A using (4) Screws 6. 3.
Step 4 Front Wall Assembly Parts required for this step 1A 1215 2X 1B 1130 1X 1C 1130 1X 2A 1640 1X 2B 1640 1X 5A 1830 1X 6A 619 1X 7C 594 2X 7D 1300 2X 26 2X 5 M6*10 18X 4 2X 16
Step 4 Front Wall Assembly, cont’d 5 1C 4.6 4.6 1B 6A 4.4 26 26 4.5 4.5 7C 4.3 7C 2B 7D 2A 7D 1A 1A 5A 4.1 4.2 4.2 Front Wall pre-assembly for future step. PC Panels are not needed at this time. 17 4.
Front Wall Assembly, cont’d Step 4 4.1 4.2 2A/2B 1A 7D 5 5A 5A Assemble Part 7D to Vertical Frames 2B using (1) Screw, Washer, Nut 5. Repeat with 2A. Assemble Corner Support 1A to Bottom Frame 5A using (1) Screw, Washer, Nut 5. Repeat at opposite end. 1B 4.3 26 4.4 5 26 5 1A 7C 1C 1A 7C 7D 7D Assemble Parts 7C, 7D, 1A and 1C to Corner Bracket 26 using (4) Screw, Washer, Nut 5. Assemble Parts 7C, 7D, 1A and 1B to Corner Bracket 26 using (4) Screw, Washer, Nut 5. 4.5 7C 4.
Step 5 Attach the Door Parts required for this step 13A 1250 2 3 4 M6*40 1X 14A 1X 11 1X 5 2X 19 380 1X 1X M6*10 4X
Step 5 Attach the Door, cont’d 5 3 13A 1B 5.3 14A 5.4 5.1 5.2 1C 2 5.
Step 5 Attach the Door, cont’d 5 5.1 5.2 1B 13A 13A Slide (3) Screw 5 into the channel on upper Door Channel 13A. 5 6A 5 Attach Door Channel 13A to parts 6A and 1B using two of the three Screw 5. 5.3 5.4 13A 1B 3 2 14A 14A 5 Attach the top of Vertical Support 14A to the end of 13A using the remaining Screw 5. 5.5 Attach the bottom of Vertical Support 14A to Roof Beam 1B using Screw 3. Make sure to use Spacer 2 as shown. 13A 11 5 Slide the Door Frame assembly onto the Front Panel Assembly.
Step 6 Side Wall Assembly Parts required for this step 3C 1215 4X 4A 1830 2X 7B 1300 4X 8A 1840 2X 5 M6*10 28X 4 22 2X
Step 6 Side Wall Assembly, cont’d 5 6.4 6.2 6.2 7B 6.4 8A 6.6 7B 6.6 3C 4A 6.4 6.1 6.3 3C 6.2 6.5 6.1 6.3 6.2 6.4 8A 7B 6.6 7B 6.6 3C 6.1 6.3 3C 6.5 4A 6.1 6.
Step 6 Side Wall Assembly, cont’d 6.1 6.2 5 8A 5 3C 3C Slide (5) Screw 5 into the channel of Vertical Wall Support 3C. Repeat 3X. Attach the top of Vertical Wall Support 3C to Horizontal Beam 8A using the Screw 5 nearest the end of part 3C. Repeat 3X. 6.4 6.3 8A 3C 5 4A 7B 5 Attach the bottom of Vertical Wall Support 3C to Horizontal Beam 4A using the Screw 5 nearest the end of part 3C. Repeat 3X. 6.5 Attach the top of Diagonal Brace 7B to Horizontal Beam 8A. Repeat 3X. 6.
Step 7 Back Wall Assembly Parts required for this step 1A 1215 2X 1E 1130 1X 1D 1130 1X 3A 1665 1X 3B 1665 1X 4B 1830 1X 7A 1830 1X 26 2X 5 M6*10 18X 4 2X 25
Step 7 Back Wall Assembly, cont’d 5 7.5 1E 7.5 7.1 7.6 7.4 1D 7.6 7A 26 1A 7.1 7.4 26 3A 3B 1A 4B 7.2 7.3 7.3 7.2 Set up the back panel for further step. Please note that no PC panel is required in this step.
Step 7 Back Wall Assembly, cont’d 7.1 7.2 1A 5 5 4B 3A/3B Slide (5) Screw 5 into the channel of Vertical Wall Support 3A and 3B. Attach Corner Vertical Support 1A to Horizontal Beam 4B using (1) Screw Set 5. Repeat on opposite end with remaining Vertical Support 1A. 7.3 1D/1E 7.4 3A/3B 26 4B 5 1A 7A Attach Vertical Supports 3A and 3B to Horizontal Beam 4B using the lowest Screw 5 inserted in step 7.1.
Step 8 19 4X 8.1 8.1 8.1 8.1 8.1 Insert Plug 19 into the ends of Diagonal Roof Braces 1B, 1C, 1D, and 1E.
Step 9 Joining the Walls Parts required for this step 29 8X 9A 5 1830 1X M6*10 14X 2X 4 5 9A 9.7 9.7 9.2 9.3 9.4 9.1 9.5 9. 4 9.6 9. 4 9.1 9.
Joining the Walls, cont’d Step 9 Place the Right Wall Assembly and Back wall Assembly on the Foundation Assembly with the help of an assistant. 9.1 Attach the bottom of Vertical Support 1A to the end of Bottom Horizontal Beam 4A using (1) Screw 5 Set. 1A Attach Horizontal Beam 8A to Vertical Support 1A and Diagonal Roof Beam 1D using (2) Screw 5 Sets. 5 4A Repeat with Left Wall Assembly. 9.2 1D/1E 1D/1E 5 8A 8A 1A 9.
Joining the Walls, cont’d Step 9 9.5 9.4 3A/3B/3C 1A 29 5A 5 5 29 27-1 Secure Back wall Assembly and Sidewall Assemblies to the Foundation Assembly by removing the required nuts and washers, installing (6) Clip 29, and replacing the nuts and washers as shown. 9.6 Remove the nut and washer from the lower corner, install Clip 29 to attach the corner of the frame to the foundation. Repeat on all lower corners. 9.
Step 10 Installing the Roof Rafters Parts required for this step 3D 1115 4X 24 6X 5 M6*10 24X 4 1X 32
Step 10 Installing the Roof Rafters, cont’d 5 9A Slide 10 .3 10 .4 Slide the two Vent Panel assemblies into the channel on Ridge Beam 9A as shown. 9A 3D 9A 3D 24 24 10 .1 10 .2 10 .
Step 10 Installing the Roof Rafters, cont’d 10.2 10.1 3D 5 8A 3D 5 Attach the lower end of Roof Rafter 3D to Sidewall Horizonal Beam 8A using the lowermost Screw 5. Repeat 3X. Slide (6) Screw 5 into the channel on (4) Roof Rafter 3D. 9A 10.3 10.4 3D 3D 5 3D 5 Attach the top end of Roof Rafter 3D to Roof Ridge Beam 9A using the uppermost Screw 5. Repeat 3X. 5 24 5 5 Attach Roof Brace 24 to Roof Rafter 3D using the second Screw 5. Repeat 1X. 3D 10.
Step 11 Installing the Panel Supports Parts required for this step 7A 1830 1X 7K 10A 635 2X 25 7 M3*10 8X 5 4 1X 35 625 12X 4X M6*10 10X
Step 11 Installing the Panel Supports, cont’d 5 11.1 11.2 7K 7A 10A 7K 11.3 7K 7K 3D 7K 7K 11.5 11.7 7K 11.3 11.4 11.5 11.6 11.1 11.2 3D 25 10A 7 7 10A 25 Install (2) T Braces 25 on Vent Support 10A using (4) Screw 7. Repeat 1X. 36 5 Attach Vent Support 10A to Roof Rafters 3D using (2) Screw 5. Repeat on opposite side. Align with lower edge of the Vent Panels and tighten.
Step 11 Installing the Panel Supports, cont’d 11.3 11.4 7K 5 1B/1C 1D/1E 7K 7K 5 3D Attach (3) Horizontal Panel Supports 7K to Diagonal Roof Beam 1B, 1D and Roof Rafters 3D using (4) Screw 5. Repeat on opposite side. 11.5 11.6 7K 5 7K 7K 1A 5 3C Attach (3) Horizontal Panel Supports 7K to Vertical Wall Supports 1A and 3C using (4) Screw 5. Repeat on opposite side. 11.7 5 7A 1A Attach (3) Horizontal Panel Supports 7A to Vertical Wall Supports 1A, 3A, and 3B using (4) Screw 5.
Set up the PC Panels Parts required for this step A4 603*1210 11X B4 603*1120 4X D4 603*590 2X F4 603*655 1X G4 620*240 1X H4 620*230 1X I4 620*600 2X X4 603*440 4X 14 178 21A 17 62 38 603 5X
PC Panels Rear A4 A4 A4 B4 B4 X4 A4 A4 D4 A4 X4 E4 E4 H4 B4 Side F4 X4 Roof A4 I4 G4 A4 D4 A4 B4 X4 A4 Roof Side A4 I4 Front Notes: 1. Peel approximately 2 inches of film from all sheet edges before installing. Remove all film immediately after the constructions completed. 2. The UV-protected side of the sheet is covered with opal white film and must face towards the sun.
Installing the PC Panels Step 12 Use of a ladder may be necessary to reach the top of the greenhouse. The sides of the panels are secured using the Spring Clips 14. To place the clips insert one end into the frame channel. Then, capture the panel in the center of the clip as shown below. Lastly, insert the remaining end of the clip into the channel. The ends of the panels are secured to the frame using Clip 17 as shown. Use (2) clips per short side.
Installing the PC Panels, cont’d Step 12 21A 21A X4 F4 21A X4 E4 12.4 A4 A4 12.7 A4 B4 B4 H4 X4 D4 21A B4 I4 12.3 12.2 X4 A4 G4 A4 21A I4 A4 A4 A4 12.5 12.1 12.
Installing the PC Panels, cont’d Step 12 12.1 12.2 X4 X4 21A 21A A4 A4 14 14 17 5A 4B 12.
Installing the PC Panels, cont’d Step 12 12.5 12.4 9A 14 10A 16A I4 B4 16A G4 D4 I4 17 8A 14 17 17A 12.6 17 A4 1C 14 12.
Step 13 Installing the Accessories Parts required for this step 8 4X 9 2X 10 2X 15 4X 16 8X 18 2X 33 4X 35 143 44
Step 13 Installing the Accessories, cont’d 13.3 13.1 13.3 13.4 13.2 13.2 13.4 13.
Step 13 13.1 13.2 10 8A 9 8A ATTENTION You may need a slotted screwdriver when you are assembling plug 10 & 9 8 1A 8 1A 16 16 15 15 13.4 13.
Anchor the Base 36 38 37 A drill will be needed to anchor the greenhouse to concrete. 36 27-1 38 A drill will needed to anchor the greenhouse to wooden deck.
Open and Close The Vents Attention: Make sure the vent is in the correct position before closing it.
Additional Strength Advice You can also glue the polycarbonate panel to the aluminum frame to enhance the stability using silicone sealant. Note Silicone sealant and caulking gun are not included in our tool kit. You can buy them locally. Only use the silicone sealant suitable for aluminum.