Installation Instructions

(Figure 4.4)
(
Figure 4.4
)
FIXED TERMINAL INSTALLATION HANDBOOK
E
N
G
L
I
S
H
33/42
This document is the property of MATRA NORTEL COMMUNICATIONS and should not be copied or circulated without permission
IH – PS8433EAE01 09/2001
4.3.6 Transceiver
4.3.6.1 Loading, configuring and customizing
Note: Before installing the transceiver (version A,B, or line connected)
it must first be loaded, configured and customized using the TPS
(see Section1.3, Document <2>).
Connect the Sub–D 25–pin male operation connector and Sub–D 9–pin
female test connector to the Sub–D 25–pin female connector on the
TPS unit via the transceiver cable supplied with the TPS.
Load, configure and customize the transceiver (see Section 1.3,
Document <2>).
Disconnect the transceiver from the TPS.
4.3.6.2 Installing the transceiver
Note: Before installing the wide band BER radio transceiver version A’
in the wall unit, remove the securing flange (Plate A–I, item 10). To
do this:
unscrew and remove the two screws (item 12) and washers
(item 11) securing the flange,
remove the flange (item 10).
Remove the transceiver securing jumper (item 3).
Place the transceiver (item 4) in its location, positioning the antenna
and operating connectors on the right–hand side.
Secure the transceiver (item 4) with the jumper (item 3).
Connect the Sub–D 25–pin transceiver connector to the Sub–D 25–pin
CIF board connector (J3) using the shielded multiconductor
transceiver–CIF cable (item 1).
Connect the coaxial cable (item 2) to the transceiver TNC connector
(J2) (fixed radio terminal only).