Owner Manual
Your E-Z UP
®
shelter
setup is now complete!
INTERNATIONAL E-Z UP, INC.
1900 Second Street, Norco, California 92860 USA
Phone (951) 279-0999 • Fax (951) 279-0888
ezup.com
800-45 SHADE
800-457-4233
Please review the following instructions and make yourself familiar with the parts and function of your E-Z UP
®
Instant Shelter
®
PARTS INCLUDED: (1) Assembled Shelter Frame, (1) Fabric Top, (1) Roller Bag, (4) Spikes
INSTRUCTIONS FOR
© Copyright 2017 International E-Z UP, Inc. USA. All rights reserved.
SET-UP
Step 1: Place your E-Z UP
®
frame in the center
of the area to be sheltered. With partner on the
opposite side of the frame, grasp two outer legs,
lift the frame slightly off the ground, and step
backwards while pulling the frame to open.
Stop when the frame is approximately 3/4 of its
fully-opened size. Set the frame back on the
ground.
Step 2: Gently unfold the fabric top, and place
it over the semi-opened frame. Attach the fabric
top to the E-Z UP
®
frame by matching the hook
and loop strips on the inside of the fabric top
corners with the hook and loop strips on each
frame corner. Pull the fabric top down over the
frame corners —pushing the hook and loop
strips firmly together.
Step 3: With a partner on the opposite side,
grasp the bottom of the diamond-shaped area of
outer trusses near the “OPEN HERE” sticker. Lift
the frame up slightly and step backwards until
the shelter is almost fully opened. Gently shake
the shelter while opening. Be careful not to
pinch fingers!
Step 4: Fold up the fabric top
corner to expose
the Auto-Slider
®
Pull Pin. Lift shelter corner
slightly off the ground and engage the
Auto-Slider
®
Pull Pin by pushing up on the frame
trusses with one hand while holding down the
top of the frame leg with the other hand. The
pins will auto-engage when aligned with the
holes on the frame legs. After the Auto Slider
®
Pull Pin has locked into place, pull the fabric top
down over the frame leg, making sure to align
and secure the hook and loop strips on the
fabric top to the frame. Repeat on all remaining
corners.
Step 5: With a partner, lift the two adjacent
outer legs up off the ground simultaneously to
about waist height. Slide the lower/inner legs
out until the leg adjustment toggle buttons lock
at selected height on each leg. There are 3
adjustment settings for each leg. Repeat on the
remaining legs.
Note: It is recommended that you use genuine
E-Z UP
®
Deluxe Weight Bags and/or Heavy-Duty
Stake Kits to secure your Instant Shelter
®
product.
Go to ezup.com for more information.
Note: The shelter top may remain in place for easier subsequent set-ups.
Step 1: With a partner, slightly lift two adjacent
corner legs simultaneously. Depress the toggle
button and slide lower/inner legs into
upper/outer legs, making sure to do two legs at
a time on the same side. Keep the toggle button
depressed while retracting leg. Repeat on
remaining legs.
Step 2: With one hand, slightly push up on the
truss near the Auto-Slider
®
Pull Pin to relieve
pressure. With the other hand, release the
Auto-Slider
®
Pull Pin by pulling the ring and push
down to ensure that it is disengaged. Repeat on
remaining legs.
Step 3: Grasp the frame on the top of the
diamond-shaped area of center trusses on the
opposite sides near the “CLOSE HERE“ sticker.
Lift the shelter up slightly, and shake it while
stepping towards your partner until the shelter is
approximately 3/4 closed. Be careful not to
pinch fingers! Grasp the two outer legs, and
push the frame together until it is fully closed.
Give your shelter a hug and place it in the Roller
Bag provided.
TAKE-DOWN
Step 4: With the closed shelter standing, slide
the roller bag over the shelter with the zippered
end at the bottom. Turn the shelter over gently
and zipper shut.
OM_Ambassador_030617_UCV.pdf 1 6/5/2017 9:33:35 AM