Product Manual

UNPACK AND OPEN
ONE-TIME TOP INSTALLATION
1
PACKAGE CONTENTS
Please read each step before you attempt to set up.
Save these instructions for future reference.
1
10’ x 10’ (3.0 m x 3.0 m) Dome
Frame
1
Recreational Grade Top
1
4-Piece Spike Kit
1
Roller Bag
Visit the Dome
page on our web site
for video instructions and more
A Place your E-Z UP
®
frame in the center
of the area to be sheltered.
B With partner on the opposite side of
the frame, grasp two outer legs, lift the
frame slightly off the ground, and step
backwards while pulling the frame to open.
C Stop when the frame is approximately
3/4 of its fully-opened size.
D Set the frame back on the ground.