Specifications
E-Z-GO Division of Textron, Inc., 1451 Marvin Griffin Road, Augusta, Georgia
USA 30906-3852 Phone: 1-800-774-3946, FAX: 1-800-448-8124
Page 4
5. Remove the two nuts (12), lock washers (13) and double end studs (14) securing the airbox to the
carburetor. Retain the hardware for reassembly. Remove the air filter housing.
6. Remove the choke bracket (15) and gaskets and slide the carburetor (7) from the engine studs.
Carefully lay the carburetor with hoses still attached to the side by the gasoline tank to be installed
later.
7. Remove the remaining carburetor insulator and gaskets from the engine.
8. Remove the two existing carburetor studs.
Fig. 1 Adjusting the Belt Tension
Jam Nut
Adjusting N
ut
Bulletin No.
3B-05