ASSEMBLY AND DISASSEMBLY INSTRUCTIONS ES 3 ES 5
5. 6. A Seeger - Ring Losen the pre-load charge by undoing screws “A”. It is not necessary to remove the screws. 1. 2. Remove the suction strainer 7. Unscrew the power cable gland. (Do the same for the floater level control cable where present) 3. Remove the seeger-ring. 4. 8. Remove the flange. Remove the O-Ring. 9. 10. Template fixture Pull out the complete electric connector. Undo the connection by pulling the two connectors apart.
11. 12. 17. 18. Rotating Seal Fixed Seal Turn the pump up side down and position it on the fixture shown in the picture. Unscrew and remove the shaft nut. Remove the washer and the spacer. 13. 14. Pull the tool holding the mechanical seal upwards to the end of the shaft. Use a mallet to remove the stainless steel oil chamber cover. 19. 20. E D Remove the impellers and the stages. C Remove the split ring housing “C” and the split rings “D”. 15. 16. Remove the circlip “E”.
23. 24. 29. 30. Rotating Seal Fixed Seal Pull the tool holding the mechanical seal upwards to the end of the shaft. Remove the alluminum seal housing. 25. 26. Remove the cover of the upper bearing housing. Remove the plastic protection of the condensator. 31. 32. F Pull out the rotor. Turn the motor housing up side down to remove the compensating washer “F”. 27. 28. Remove the screw from the upper motor cover. Use a mallet to remove the upper bearing housing. 33.
. 6. Position the cover of the upper bearing housing. 1. 2. 7. Position the upper bering housing and slide through the electric wire and connector from the stator. There may be a second set of wires and connector when the unit is equipped with a floater level control. Position the electric wire protection at the top of a new stator. 3. Position a new o-ring and fit the upper motor cover making sure not to damage the o-ring. Bring the wire’s connector out. 4. 8.
11. Special tool 12. 17. Special tool 18. Rotating Seal Rotating Seal Fixed Seal Fixed Seal Position a new fixed face of the mechanical seal into its housing as well as a new o-ring. Lubricate the o-ring. Slide the seal housing onto the motor casing making sure not to damage the mechanical seal face or the o-ring. Position two new o-rings in their sits on the motor housing and lubricate them. With caution in not damaging the o-rings, fit the oil chamber cover.
23. 24. 29. 30. A Position the spacer and the washer. Screw on firmly the locking nut. Insert the outside sleeve. 25. Tighten firmly the six screws “A” in order to provide a preload charge to the discharge head. 26. 31. Lubrificate the o-ring and insert it between stage and outside sleeve. Check the screw position. The screw must be in the center of the discharge. 27. Assemble the suction strainer. 28. 32.
Exploded View - ES 3 / 5 50.01 50.00 30.09 50.01 30.07 40.02 40.00 30.08 50.01 Exploded View ES 3/5 50.00 30.07 10.02 10.04 50.01 40.02 40.00 50.01 30.08 30.05 30.04 50.00 50.01 30.00 30.05 40.02 40.00 30.06 30.09 50.01 50.00 30.05 30.03 30.01 50.01 40.02 40.01 30.05 40.03 30.02 30.06 10.06 30.09 30.05 10.05 30.09 30.02 10.01 (1) 50.00 50.01 30.00 40.02 00114065 12/2010 10.03 40.00 20.
Assebly / Disassembly Tools Tool list: - Plastic Hammer - Screw driver 5x100mm - Screw driver 8x150mm - Philips screw driver 3x100mm - Combination wrench 13mm - Combination wrench 22mm - Wrench torque 22mm 5-15Nm - Allen wrench T 4mm - Allen wrench T 6mm - Pliers for circlip - Template fixture (see drawings to chapter “Special tool” of this catalogue) - Special tool for mechanical seal (see drawings to chapter “Special tool” of this catalogue) Others: - Syringe or graduated cup - ESSO Marcol 82 Oil - Alcoh
18/20 19/20
Vertical S.r.l. via Asolo, 7 36031 Dueville (Vicenza) - Italy Tel. +39 0444 361114 Fax +39 0444 365247 P.IVA e C.F. 00558130241 e-mail: sales@vertical.vi.it www.etechpumps.com Single member - Company subject to the control and coordination of Franklin Electric Co., Inc. 00102445_ed.