Specifications
PROPRIETARY DATA: This document contains proprietary data of ABB Inc. No disclosure, distribution (electronic or otherwise),
or other means of dissemination may be made without written permission.
3BUS 208 000 R130164 Utility Service Installation
24. Select on sheet at the platform. The on sheet light should illuminate if the
communication to the Host is proper and if the sheet break signal is indicating
no break (closed contact).
Note: Until this time, the system has been operating without any regard to
the set up and tuning of the software load. There are several
procedures required to ensure that the configuration, platform tuning,
and sensor tuning are appropriate for the installation. Please refer
to “Measurement Setup” on page 107; the STLP-3 and STLK-11
Basis Weight Sensor Operations Manual (3BUS 208 129 RXX01);
and the appropriate Scanning Platform System Software Manual,
3BUS 208 [049-054] RXX01.
For an explanation of the various LEDs on the ECPSR and MPRC, see Table 11-1
on page 227, Table 11-3 on page 229, and Table 11-4 on page 230.










