Specifications

PROPRIETARY DATA: This document contains proprietary data of ABB Inc. No disclosure, distribution (electronic or otherwise),
or other means of dissemination may be made without written permission.
3BUS 208 000 R1301 63Utility Service Installation
16. With the power now fully on, re-verify the input voltages at the SP main circuit
breaker. The SP input must still be 240 VAC +10%, -14% phase-to-phase; 120
VAC +10%, -14% each phase-to-neutral and each phase-to-ground.
17. Turn off the SP main circuit breaker.
18. Securely fasten the power entrance cover.
Note: 1. After the initial power up sequence, it is not necessary to turn off
each individual circuit breaker. Just using the main circuit
breaker is sufficient.
2. Do not turn on the DC circuit breaker before turning on the TOP
AC and BOTTOM AC circuit breakers. The ECS/SMIs use timers
to turn on the various sensor heaters in a delayed sequence.
These timers start as soon as the SMIs finish their start up. If
the DC circuit breaker is turned on too long before the TOP AC
and BOTTOM AC circuit breakers, the resulting current surge to
all the cold heaters may cause the main circuit breaker to trip.
19. Turn the main circuit breaker back on and check the following:
a. Control panel lights should illuminate in a start-up sequence ending with
the green source symbol and Local lights on.
b. All other PC boards in the ASPC should illuminate their lights with a start-
up sequence that initially shows red lights and within two minutes have
stationary or blinking green lights. If the MPRC red Error LED continues
to blink, you should load the BRAM software.
c. The motor controller, located on the drive end column, should have the on
light illuminated.
d. The fans at the motor controller and in the electronics cabinet should
operate.
20. Push the MAINTENANCE push button on the control panel. The lights on the
panel should illuminate in a sequential pattern.
21. Push the JOG FORWARD and JOG REVERSE push buttons to verify that the
head moves as instructed.
22. Select the REMOTE push button and verify that the remote and off sheet lights
are illuminated, and that the heads travel to the home limit switch and continue
to the off sheet position.
23. Execute a local standardize from the control panel. Verify that the light is
illuminated and a standardize cycle is executed. The shutters should open and
the Caliper sensor should close during this cycle. A successful standardize for
all sensors is indicated by the standardize light not blinking after the cycle is
completed.