3BUS 208 000 R1301 59Utility Service Installation
Electrical Hook-Up
Cabling to a Scanning Platform is minimal. All that is normally required for hook-
up are the AC power, serial communication loops to the host system and Service
Workstation, sheet break detector, Liquid Cooling Unit (LCU) flow switch(es), and
reel turn-up detector. Other auxiliary equipment (for example, microwave or
smoothness processors), depending upon the configuration, may also require cables
to the ABB Smart Processing Center (ASPC).
For details of the TCP-IP Ethernet connection to the 086444-xxx MPRC, see ABB
Functional Drawing 086424-201. This drawing outlines the details of the required
132573-001 “Y” cable which plugs into J6 “HOST” connector on the ASPC
backplane. It also shows the redundant Ethernet port which exits the electronics
enclosure through an aluminum shield grounding block attached to the front door
of the ASPC. This redundant Ethernet port is normally not present. A Fiberoptic
Transceiver (ABB 102204-001) is required to meet CE Mark Radio Frequency
emissions and susceptibility requirements. Using twisted pair or coaxial Ethernet
transceivers is not certified to meet CE Mark. The suggested fiberoptic cable is
ABB 102205-001 with 102206-001 “ST” connectors. These “ST” connectors
require special tooling such as the ABB 102206-100 tool kit.
The platform is connected to customer power via the Scanning Platform Power
Distribution Center (SPDC). The SPDC also provides the power for the purge
blower, Liquid Cooling Unit (LCU), and various auxiliary equipment. The SPDC
is an integral part of the SP electrical design and is required to meet electromagnetic
compliance (EMC) specifications and standards. See Figure 4-3.