Specifications

PROPRIETARY DATA: This document contains proprietary data of ABB Inc. No disclosure, distribution (electronic or otherwise),
or other means of dissemination may be made without written permission.
3BUS 208 000 R1301204 Replacement Procedures
Note: Do not reuse signal cable connectors. They must be replaced each
time a new signal cable is installed.
13. Terminate power cable according to Engineering Drawings 121974-003, and
121974-004.
14. Feed cables back at the same time through the trough leading to the carriage
and reinstall the cable carrier mounting bracket.
15. At the idler end column, reinstall the cable carrier retaining bolt and cut the new
power cable to the length needed to dress into the end column PC board. Install
the connector according to Engineering Drawings 121974-003 and 121974-004.
16. Reconnect the power and signal cables to the idler end column PC board.
17. Jog the head to the idler end column, pull out the carriage PC board and
reconnect the power and signal cables.
18. Push the carriage PC board back into place.