Specifications

PROPRIETARY DATA: This document contains proprietary data of ABB Inc. No disclosure, distribution (electronic or otherwise),
or other means of dissemination may be made without written permission.
3BUS 208 000 R1301 201Replacement Procedures
Roller Assembly
Use the following procedure to replace roller assembly. See Figure 10-9 and Figure
10-8.
The Scanning Platform design allows replacement of this
item while the customers process is running. Exercise
caution to ensure that the seal belt is kept clear of the
process while being removed and replaced.
1. Jog the sensor heads to the end column that provides access to the roller that
needs replaced.
2. Turn off the power to the drive motor.
3. Loosen the seal belt clamp and relieve tension from the split roller assembly.
See Figure 10-6 on page 198.
4. Remove the bolt securing the damaged split roller assembly.
Figure 10-9 Roller Assembly
5. Remove the roller assembly.
6. Install the new roller assembly.
7. Add thread–locking compound to the threads of the bolt that secures the split
roller. Reinstall it.
8. Pull the seal belt through the seal belt clamp to remove any slack in the seal belt.
9. Adjust tension such that the seal belt lays flat in the tray without any deflections
in the seal belt roller assembly. See Figure 10-8.
Drive Timing
Belt
Retaining
Bolt
Add thread–locking
compound In Threads