Specifications
PROPRIETARY DATA: This document contains proprietary data of ABB Inc. No disclosure, distribution (electronic or otherwise),
or other means of dissemination may be made without written permission.
3BUS 208 000 R1301 147Measurement Setup
Implementation of the Sensor Verification Program
A major portion of Phase I can be implemented using only the Service Workstation
and the Scanning Platform.
Activities include:
• Reading of all of the check samples
• Recording standardize stability
• Recording check sample repeatability
• Recording internal check sample readings
• Verifying calibrate sample function operation
• Scanning on air gap and on samples to verify static profiles (requires Host
system)
• Generation of Phase I verification results report.
Phase II and Phase III are implemented using mostly the Host computer reporting
and graphing packages.










