Specifications

PROPRIETARY DATA: This document contains proprietary data of ABB Inc. No disclosure, distribution (electronic or otherwise),
or other means of dissemination may be made without written permission.
3BUS 208 000 R1301 105Platform Tuning
Other Host Setup Procedures
The Host computer has several other important parameters that must be entered to
assure proper operation of the measurements system including the following:
Scanning time, typically takes 15-30 seconds
Number of profile points, typically takes 100-600
Standardize interval, typically takes 30-120 minutes
Product code slopes, offset, compensations, and IR 4-filter flag
Composite profile filter factor
Requests for report printing
Trend graphing of measurement and standardize results
Please refer to the appropriate system manuals for details.