User manual
2
Lift upwards
2. Insert the arms to the connection points, and use the
Hex key to fasten the four countersunk screws on
each arm, as shown in figure 2-2.
Figure 2-2
2.2 Power-on Test Before the Installation of Device
1. Please make sure that the power requirements are strictly met to avoid permanent damage to the unit. You could change the input
voltage 110V or 220V through the DIP switch, as shown in figure 2-3.
Note: The tripod turnstile must be connected to ground (earth).
2. Power on and wait 30s for the tripod turnstile to finish the self-check program.
3. Lift the arms manually, as shown in figure 2-4.
4. Check whether the tripod turnstile and the LED indicators work properly.
If there is any problem, please refer to section 4.2 or kindly contact the supplier.
Figure 2-3 Figure 2-4
3. Equipment Installation
3.1 Installation Conditions
The equipment must be installed on concrete ground, ensuring that expansion bolts can be secured firmly.
You are suggested to install an assistant framework or fence to form a passageway, as shown in figure 3-1.
Figure 3-1
Tighten the four screws on each
arm in clockwise direction.
220V
110V
220
110
220V
110V
DIP switch
Label
There is a voltage DIP switch in the
side direction of this power supply.
Wiring
terminal
260
500
260
500
<80