Installation Instructions

2
Sl-154 (06•06)
TOOLS AND MATERIALS* See back cover page.
ROUGH-IN FRAMING
After you have determined where your MUSTEE SHOWERWALL is to be located, you will have to construct the appropriate
alcove. Be sure to plan your rough plumbing requirements (drain-venting-supply lines) at this time. Refer to “ROUGH-IN”
illustrations for dimensions, Fig. A, B & E.
After you have constructed your alcove and completed your rough plumbing requirements you are now ready to install the
shower receptor, 3636C - Neo Angle or 3636DT - Double Threshold.
HINT: This would be a good time to install Kraft Faced fiberglass insulation or unfaced batting with a 4 mil. (poly) vapor
barrier film between the open studs of your alcove area.
SHOWER RECEPTOR INSTALLATION
1. The shower receptor must not be installed on exposed floor joists, if there is no sub-floor at the desired location, a one-
piece section of plywood (CDX) the same thickness as the surrounding sub-floor must be securely fastened in position so
that the shower receptor is fully supported.
HINT: To eliminate “creaking or squeaks” we recommend the “deck” type screws (3” min. length) to be used to secure the sub-
floor to the floor joists especially under the shower receptor in the alcove area.
2. As specified in the “ROUGH-IN” illustrations - a 5” (inch) square opening in the sub-floor or slab is required at the centerlines
of the alcove to accept the shower drain body. Drain connection requires 2” (inch) DWV pipe.