Installation Instructions

Sl-165 (07•07)
CARE AND CLEANING
The surface of your Durawall Bathtub Wall may be cleaned with a mild soap solution in warm water using a soft cloth. For
stubborn stains use “Soft -Scrub” by Clorox or Lysol “Tub & Tile Cleaner” or a powdered detergent such as “Spic-n-Span”.
Never use abrasive scouring powder or steel wool pads as they will scratch the surface. A periodic coating of a silicone based
marine polish will help retain the fine finish.
Warning:
Do not use spray-on cleaners that require daily use without immediately rinsing to stop chemical reaction. Damage will result
and void warranty.
®
Center Panel - Permanent Installation.
Apply a 1/4” dia. bead of adhesive to the
back side of the Center Panel using the
pattern shown in FIG. 5 as a guide. Fol-
low “ADHESIVE NOTE / VENTING
METHOD”. Remove protective liner from
factory applied tape and permanently re-
position panel to guide lines. Clean any
excess adhesive and grease pencil line im-
mediately with mineral spirits, then wash
area with a soap and water solution to
neutralize solvent.
5.
Wait approximately 12 hours before apply-
ing caulking. Caulk all around. Remem-
ber to caulk around faucet spout and
handle hole(s). Follow caulking instructions
label for clean up of excess caulk.
6.
Replace faucet spout and handle(s), turn on
water supply to bathtub alcove. Wait 24 to
36 hours (giving adhesive time to develop
bond strength) before using tub or shower.
7.
E.L. MUSTEE & SONS, INC.
5431 West 164th Street Brook Park, Ohio 44142
FIG. 5
CENTER PANEL
MODEL
300.600W
WINDOW TRIM KIT
(SOLD SEPARATELY)
5 - PC. FIBERGLASS KIT
ACCOMODATES WINDOWS UP TO 36”
WIDE x 8” DEEP.
SMOOTH, EASY TO INSTALL PANELS
PROVIDE WATERPROOFING FOR
WINDOWS IN BATHTUB ALCOVE.