Installation Instructions
3
Sl-165 (07•07)
Corner Panel -
Permanent Installation
Adhesive Pattern: Apply a 1/4” dia. bead
of adhesive to the back side of one of the
Corner Panels. Refer to FIG. 4 for rec-
ommended adhesive pattern. Follow
“ADHESIVE NOTE / VENTING METHOD”.
NOTE: You may also use large head di-
ameter tacks or “Roofing” style nails next
to “overlap” edge of panel if required.
These nails do not have to be removed
as they will be covered by Center Panel.
(See detail in FIG. 4 for suggested nail
placement.)
Note: Any dirt or molding/body oils on
panel overlap area may affect adhesion.
To avoid adhesion problems, wash over-
lap area of Corner Panels with rubbing
alcohol after installation and prior to in-
stalling Center Panel.
4.
INSTALLATION:
FIG. 3
FIG. 4
ADHESIVE NOTE:
We recommend that each panel be “vented”.
VENTING METHOD -
Apply adhesive to back
side of panel as illustrated, align all guide lines and
press panel firmly to wall, compressing adhesive,
hold in approximately 30 seconds, then pull panel
away. Remove protective liner from tape strip (if
required), wait 4 minutes. Carefully reposition panel
and press back firmly into place. To insure proper
adhesion, go over entire tub surround 20 minutes
after all (3) three panels are in place, pressing firmly
by hand or tapping with a padded block. Wait 24
to 36 hours (cure time) before using tub or shower.
CORNER PANEL
INSTALLATION HINT:
If existing wall condition does not allow
panel edges to lay flat, unit may be ‘blocked’
as shown below while adhesive cures.