Installation Instructions
TOOLS AND MATERIALS NEEDED:
MUSTEE
DURAWALL
3 PC. BATHTUB WALLS
INSTALLATION INSTRUCTIONS
MODEL 350
FIBERGLASS
• Electric or Hand Drill • Hole Saw • Caulking Gun • Adhesive (Add’l may be req’d.)
• Tape Measure • Level (24" Min.) • Grease Pencil • Adjustable Wrench
• Razor Knife • Masking Tape (2” wide) • Mineral Spirits • Screwdrivers (Std. & Phillips)
NOTICE:
We recommend that tub/shower compartments be equipped with support Grab Bars that comply with ANSI-117.1 - 1986
requirements. Panels have been reinforced on the backside with ribs at areas shown for this purpose. Grab Bars must
be anchored to structural support behind panels. Do Not rely on panels only for grab bar support.
PREPARATION:
We do not recommend installing the Durawall Bathtub Wall Panels over any existing tile surfaces.
The Durawall Bathtub Wall may be installed over drywall, plaster, painted walls, plywood, or any solid wall- not open
studs. Wall surfaces must be clean, dry and free of grease, dust and loose or flakey paint or plaster. Shiny smooth surfaces
should be sanded or scratched to insure a positive bond.
E.L. MUSTEE & SONS, INC.
5431 West 164th Street • Brook Park, Ohio 44142
Sl-165 (07•07)
®
®
®
ADA
DESIGNED
PRODUCT
NEW YORK CITY: M.E.A. NO. 8-88-M