Installation Guide
2
Instruction Manual for Installing E-Glide Ladder Hardware
Hardware Included:
Step 1: Rail Installation 
Special application notes:
•  Do not mount rail brackets directly onto a drywall 
surface. Always mount these brackets to solid 
wood, predrilling the holes is advisable to avoid 
splitting the wood.
•  Clearance requirements:
•  Ladder in the stored position (close to the 
wall/cabinet/bookshelf). Leave at least 
2 ½” of clearance between the top of the 
rail and the ceiling, crown molding or other 
overhanging protrusions (figure 1). 
•  Ladder in the climbing position, a minimum 1” 
clearance between the top of the rail and any 
upper cabinet doors is required to be able to 
open these doors (figure 2).
Figure 1 Figure 2
Installation Tools Needed:
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
 x2
M5x18
 x2
M6x30
 (x1)
2mm 4mm
 (x1)
 3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
1.  Rail height determination: Distance from the floor to the location on the header board 
where the screw for the rail bracket will be fastened.
•  For the 92” ladder = 88 1/4” to 89 1/4”
•  For the 107” ladder = 103 1/4” to 104 1/4”
⁄” Drill Bit
10mm Wrench
Drill
Tape 
Measure
Level
#2 Phillips 
Screwdriver
Stored Position Climbing Position
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
 x2
M5x18
 x2
M6x30
 (x1)
2mm 4mm
 (x1)
 3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
 x2
M5x18
 x2
M6x30
 (x1)
2mm 4mm
 (x1)
 3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
 x2
M5x18
 x2
M6x30
 (x1)
2mm 4mm
 (x1)
 3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
 x2
M5x18
 x2
M6x30
 (x1)
2mm 4mm
 (x1)
 3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
 x2
M5x18
 x2
M6x30
 (x1)
2mm 4mm
 (x1)
 3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
 x2
M5x18
 x2
M6x30
 (x1)
2mm 4mm
 (x1)
 3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
 x2
M5x18
 x2
M6x30
 (x1)
2mm 4mm
 (x1)
 3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
 x2
M5x18
 x2
M6x30
 (x1)
2mm 4mm
 (x1)
 3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
 x2
M5x18
 x2
M6x30
 (x1)
2mm 4mm
 (x1)
 3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
 x2
M5x18
 x2
M6x30
 (x1)
2mm 4mm
 (x1)
 3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
x2 x2










