User Manual

EN
Prefl ight
1 Remove and inspect contents.
2 Read this instruction manual thoroughly.
3 Charge the fl ight battery.
4 Fully assemble the airplane.
5 Install the fl ight battery in the aircraft (once it has been fully charged).
6 Check the Center of Gravity (CG).
7 Bind the aircraft to your transmitter.
8 Make sure linkages move freely.
9 Perform the Control Direction Test with the transmitter.
10 Perform the AS3X Control Direction Test with the aircraft.
11 Adjust fl ight controls and transmitter.
12 Perform a radio system Range Test.
13 Find a safe open area to fl y.
14 Plan fl ight for fl ying fi eld conditions.
Model Assembly
Required Adhesives:
Medium CA
Main Landing Gear Installation
1. Apply Medium CA (cyanoacrylate adhesive) to the tab end of the exhaust
pipe (A) and attach it to the main gear assembly as shown.
2. Install the main landing gear (B) to the bottom of the fuselage and secure
into place with 4 included screws.
When needed, disassemble in reverse order.
A
B
13mm (2)
4