Installation Guide User Manual

SV-XPNDR-261/262 Installation, Configuration, and Testing
SkyView System Installation Guide Revision S 11-3
ADS-B Out compliance credit since it does not meet the power transmission requirements of
the ADS-B rule.
Figure 74 has a high-level overview of a suggested SV-XPNDR-261/262 installation,
configuration, and testing procedures:
Figure 74 Suggested SV-XPNDR-261/262 Installation, Configuration, and Testing Procedure
Physical Installation
Mounting Tray and SV-XPNDR-261/262 Dimensions
Figure 75 SV-XPNDR-261/262 Mounting Tray Dimensions