Installation Guide
PC6-16046
1 Remove the main seat and the passenger seat.
2 Remove the BLACK left-hand side inner fairing panel.
This panel surrounds the gauges down to the fuel
tank.
It is held in place by two bolts.
3 Prop the front of the fuel tank up.
4 Using the supplied Velcro, secure the PC6 module in
the tail section as far back as possible.
Clean both surfaces with the supplied alcohol swab
prior to applying the Velcro adhesive.
5 Route the PC6 wiring harness forward towards the
engine along the inside of the frame on the left-hand
side of the bike.
6 Lift the ECU out of place.
7 Remove the two pins securing the battery cover and
remove the battery cover itself.
8 Secure the PC6 ground wire with the small ring lug to
the negative (-) terminal of the bike’s battery.
9 Reinstall the battery cover and the ECU.
INSTALLING THE POWER COMMANDER 6





