Installation Guide Owner's manual

INSTALLATION
Blower and Monitor Support Installation
Version 4 In Ground Model 200iP/250iP Motorcycle Dynamometer Installation Guide
2-23
INSTALLING THE MONITOR SUPPORT AND JUNCTION BOX
The high pressure blowers are an optional accessory. If you did not order high
pressure blowers, you will not need to install the blower mounting plates. Refer page
2-21 to for high pressure blower installation instructions.
1 Secure the blower mount, monitor support arm, and junction box to the pit floor
using four 3/8 x 1-inch bolts and four 5/16-inch washers.
Note: The left blower mount is secured under the support arm.
2 Secure the right blower mount to the pit floor using four 3/8 x 1-inch bolts and
four 5/16-inch washers.
The high pressure blowers are an optional accessory. If you did not order high
pressure blowers, you will not need to install the blower mounting plates.
3 Verify the blank plate is secured to the junction box as shown in Figure 2-18.
Figure 2-18: Install the Monitor Support Arm and Junction Box
PD159
support arm
blower mount
junction box
blower mount
(under support arm)