Installation Guide Instruction Manual
INSTALLATION
Cable Routing
Version 4 In Ground Model 224 Automotive Dynamometer Installation Guide
2-7
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CABLE ROUTING
Use the following instructions to route the cables. You will need to route the cables
before installing the pit covers.
CONNECTING THE DYNO ELECTRONICS AND SHOP AIR
You will need the following parts:
• 318110301 Power Cord
• 42924250 25-pin Cable
• 53415040 Power Supply
• 76199003N Dyno Electronics
1 Route the 25-pin cable from the Breakout board, through one of the PVC conduits
in the pit, and to the dyno electronics.
Refer to page 1-10 for more information on connecting to the dyno electronics.
Refer to page 2-9 for more information on wiring the Breakout board.
2 Route the air hose from your shop air supply, through one of the PVC conduits in
the pit, and connect the air hose to the T fitting on the dyno brake solenoid.
Note: The air brake comes installed with a hose barb for a 3/8-inch inside
diameter air hose. If your hose does not have an inside diameter of 3/8-inch then
you will need an air hose nipple (1/4-inch NPT) to connect your clean, dry shop
air supply to the dyno. Once the pressure is connected, the air brake is ready to
use.
3 Connect the power supply to the dyno electronics. Plug the power supply into
your power source.
Figure 2-4: Route the Cables
power supply for
dyno electronics
breakout board
dyno
electronics
dyno electronics
cable
shop air
pit conduit