Installation Guide Owner's manual

INSTALLATION
Dyno Installation
Version 3 In Ground Model 224 4WD Automotive Dynamometer Installation Guide
2-9
PLACING THE DYNO IN THE PIT
You will need to keep the cable track routed underneath the dyno and towards the
stationary dyno.
1 Verify the rail clamps are positioned as shown in Figure 2-7.
2 Verify the dyno movement motor is facing away from the stationary dyno.
3 Using the forklift, gently lower the dyno onto the rails.
Note: Make sure the dyno movement motor is facing away from the stationary
dyno.
Note: For clarity, the pit in Figure 2-7 has been cut away to show the rail clamp
positions.
Figure 2-7: Lower the Dyno into Pit
rail clamp
dyno movement motor facing
away from stationary dyno
cable track under dyno and
towards stationary dyno