Service manual

Functional Verification Tests
9650-0801-01 Rev. A ZOLL Propaq MD Service Manual 21
Functional Verification Tests
Before You Begin the Functional Verification Tests
Assemble the tools listed in following section, “Equipment You Need to Perform the
Functional Verification Tests.”
Keep an extra fully charged Propaq MD battery available.
Schedule an hour to conduct the entire maintenance test.
Perform the tests in the order presented.
Perform all the steps of each test procedure.
Complete all the steps of the procedure before evaluating the test results.
Equipment You Need to Perform the Functional Verification Tests
For testing purposes, you can substitute an equivalent device.
Fluke Impulse 7000DP Analyzer, or equivalent, with appropriate interface adapter
(Dynatech Nevada Inc. part number 3010-0378)
IBP/Temp Simulator, or equivalent
NIBP Simulator
Single or dual lumen NIBP hose
Adult NIBP cuff and a rigid cylinder to wrap it around
5% CO
2
calibration gas cylinder with CO
2
sample line (kit available from Scott Medical
Products, PN 4653ORF-BD)
ECG Simulator; 12 Lead Simulator for 12 Lead test (e.g., Symbio CS1201)
Accessories You Need for the Propaq MD Options Functional Verification
Tests
3-lead, 5-lead and 12-lead ECG cables. (12-lead cable needed if 12-lead option is
installed.)
NIBP cuff and hose
IBP cable
SpO
2
cable
and sensor
EtCO
2
cable
and sensor
Paddles
Printer paper
Battery
Auxiliary power source