Service manual
Service Manual Repair Procedures 73
6. Lift out the Recharger board.
When installing the Recharger board:
• blow out any dust and particulates using pressurized de-ionized gas
• move all cables out of the way
• torque screws to 3.8in-lbs to 4.2in-lbs (.43N-m to .47N-m)
Caution As you set the board in place during installation, keep the board clear
of the power switch solder terminals to avoid binding against them. The
terminals may become damaged if force is applied against them.
0696 40
Screws
Screws